Bill Collins      904-247-2865     wvi@comcast.net

1. HOME PAGE 2. After Paint Removal
3. Plywood Deck Removal 4. CENTER CONSOLE
5. Center Console Removal & Bilges Cleaned 6. Coming Together
7. Cable & Wire Runs 8. Center Console
9. Deck Repairs 10. Flotation Install
11. Plywood Decking 12. Trailer Repair
13. Bow EYE Protection 14. ROD HOLDER INSTALLATION
15. CONSOLE RETURNS 16. Interior VIEWS
17. Interior LIGHTING 18. Hull Painted
19. Rub Rails 20. Battery Connections
21. Carpet Install FWD of Center Console 22. Seat / Cooler Box Combo Installed forward of CC
23. Motor   STARTED 4-1-2010 24. Aft Deck area  Painted ~ Hand holes & Padding installed
5-24-2010`
25. BOAT RIDE / SEA TRIALS     Underway 4-14-2010 Problems encountered on trials & Since:      
1. Ignition switch loose tightened  and tested satisfactory
2. Shifter and throttle cables  replaced and tested sat
3. New Fuel Tank sending unit (in tank) and gauge (on console)  INSTALLED and tested 6-20-2010
4. Installed gauge to check battery condition and charging system INSTALLED and tested 6-20-2010
26. TOP ~ Helm Seat w/Cooler Base ~ Console gauges  
Completed  6-25-2010    
27. Top "modifications" completed Feb 2011
28. "Newer Bigger Motor" INSTALLED Aug 7, 2011  
 
"CLICK ON PHOTOS FOR A BETTER VIEW"
TOP & Finishing Touches
Top, Seats & Gauges

Click on photos for FULL SIZE

 T-Top.JPG (276342 bytes)
Bought a used "T" Top and redesigned the supports to accommodate my boat.
I tied it in to bring it home!

T-Top before modifications
Removed the RED TOP
T-TOP before modifications           NOTE: Position of support poles
Top installed
NOTE the wider stance for the supports and they are now welded to the outer plates.
NOTE forward COOLER seat reinstalled

I used a small tarp to block the sun while I installed the top.
TOP IS BOLTED DOWN to the gunwales and the center console!

Side View
Side view
NOTE Seat back shows for the Swing Back COOLER Seat
Spare tire is mounted, under the bow.
T-top_cover_on
RED TOP Reinstalled
T-top_cover_on_1
RED TOP Reinstalled
TOP after weld REPAIRS completed

VERTICAL Support welded at top BROKE
Click on photo ABOVE to see repairs

SWING BACK helm seat W/ cooler base
SWING BACK SEAT W/ cooler base, installed
SWING BACK helm seat W/ cooler base
SWING BACK SEAT W/ cooler base, installed
FLIPPED the opposite direction
GAUGES installed
GAUGES installed; fuel and electrical.
I had to replace the fuel tank sending unit as well.
Electrical shows battery condition and charging system 
(this is a NEW installation as the boat did not have one before)
1. HOME PAGE 2. After Paint Removal
3. Plywood Deck Removal 4. CENTER CONSOLE
5. Center Console Removal & Bilges Cleaned 6. Coming Together
7. Cable & Wire Runs 8. Center Console
9. Deck Repairs 10. Flotation Install
11. Plywood Decking 12. Trailer Repair
13. Bow EYE Protection 14. ROD HOLDER INSTALLATION
15. CONSOLE RETURNS 16. Interior VIEWS
17. Interior LIGHTING 18. Hull Painted
19. Rub Rails 20. Battery Connections
21. Carpet Install FWD of Center Console 22. Seat / Cooler Box Combo Installed forward of CC
23. Motor   STARTED 4-1-2010 24. Aft Deck area  Painted ~ Hand holes & Padding installed
5-24-2010`
25. BOAT RIDE / SEA TRIALS     Underway 4-14-2010 Problems encountered on trials & Since:      
1. Ignition switch loose tightened  and tested satisfactory
2. Shifter and throttle cables  replaced and tested sat
3. New Fuel Tank sending unit (in tank) and gauge (on console)  INSTALLED and tested 6-20-2010
4. Installed gauge to check battery condition and charging system INSTALLED and tested 6-20-2010
26. TOP ~ Helm Seat w/Cooler Base ~ Console gauges  
Completed  6-25-2010    
27. Top "modifications" completed Feb 2011
28. "Newer Bigger Motor" INSTALLED Aug 7, 2011  
 

YEP, I'm a DEMOCRAT!   HA!!!

On the ARMY thing, both of my sons joined!
One for 4 years the other decided to make it a career.
I am RETIRED NAVY!

For me, EVERY DAY is Veterans Day and
I  pray for those that paid the ultimate sacrifice for our country,
thanking God we have men and women willing to do this!